Pyramid Construction were selected to build five two-bedroom bungalows in St Annes, Bristol.  Built on the former Bristol City Council depot site, this project provided much needed housing for local residents.

These five homes were constructed with Beam & Block floors, masonry cavity walls with a render finish. The roofs were constructed with highly insulated cassette trusses and finished with concrete roof tiles.

External work proved challenging as there was a need for a sustainable urban drainage system, along with a large retaining wall and relocation of Western Power cables.

This project was certified by LABC, with air permeability and acoustic test results well above the required level, which left future residents to enjoy these new homes in comfort.