50 Park Street

Pyramid Construction were appointed as the Main Contractor to carry out the refurbishment of the bar/nightclub at 50 Park St, Bristol. The project changed from the original scope and Pyramid Construction worked closely with the client team to install supporting steelwork, designed propping, demolish the existing building and install pre-fabricated modular units.

As this was the first project in Bristol where modular units were installed between existing buildings, this was a challenging situation for everyone involved.

Once the modular units were installed, Pyramid Construction then carried out the connections of services, communal decorations and flooring, masonry external skin to the units and roof coverings.